Skydiving rig replacement parts

  1. Main Closing Loop: Inspection and Installation

    Inspect the full main closing loop. Take the loop out of the main closing loop retainer and grommet. Inspect where the washer rests for any damage. Inspect where the loop passes through the grommet for any damage. Inspect the loop itself. Feel the grommet and washer for sharp edges.
    Make a new loop to the desired length with two overhand knots to secure behind the washer. Replace the loop back into the grommet and into the main closing loop retainer. Check that the main closing loop retainer is in good condition and secure. Do a final inspection on the exposed main closing loop. Close the container and go jump! Continue reading
  2. Main Pilot Chute Installation

    Here's some info and a video of installing one type of main pilot chute. While each main pilot chute may have a slightly different attachment part, the general idea is the same.
    This Cazer pilot chute came with two metal links. We prefer to substitute those two metal links with a PD Reserve Slink and a PD Main Slink. The reserve soft link is used to attach the bridle to the inside of the main D-bag. The main soft link is used to attach the end of the bridle to the top of the canopy. Continue reading

2 Item(s)