Argus Ruggedized Kit Installation
The Argus Ruggedized Kit consists of a black metal face plate, stainless steel button and super glue. This kit protects LCD display screen against routine knocks to the display from use, packing or transportation.
12 small dots of super glue are placed around the outside edge of the face of the unit. 5 along top, 5 along bottom and 1 on each side.
The button is centered on the logo, where the current press-button is located. No super glue is used to hold the button in place.
Press and hold the black face plate onto the front of the display for 5 seconds to set and then let set for at least 5 minutes before turning on to make sure install was completed correctly. The unit can be reinstalled after 30 minutes.
The ruggedized display is standard on units manufactured from 2010 and after.
The Argus is no longer manufactured, but ChutingStar still stocks some replacement parts. See the listings at this link for Argus parts still available from ChutingStar.
- Updated Mirage Packing Tips
- New U.S. Agent For Service Regulation Affects All Foreign FAA Riggers
- Current Deals!
- PD Used Canopy Sale!
- Stock Firebird EVO Containers Available!
- 2025 ChutingStar Staff & Holiday Breaks
- Sealing Material Options For Riggers
- SonoAlti 3V Service Bulletin Update Improves Sound Quality
- UPT Stock Container List
- Vmag V2 Trade-In Exchange Program
- Updated Mirage Packing Tips
- New U.S. Agent For Service Regulation Affects All Foreign FAA Riggers
- Current Deals!
- PD Used Canopy Sale!
- Stock Firebird EVO Containers Available!
- 2025 ChutingStar Staff & Holiday Breaks
- Sealing Material Options For Riggers
- SonoAlti 3V Service Bulletin Update Improves Sound Quality
- UPT Stock Container List
- Vmag V2 Trade-In Exchange Program